Pepro LLC

Pepro FLY-IN Sites

Pepro Fly-In shielded enclosures are engineered to perform in the harshest environments and terrain. As an Integrated solution, they provide a complete site installed in less than a day.


Pepro Remote Communication Shelter, Walk-In Shelter, Mountain-Top Shelter delivered by helicopter, Cell-on-Wheels (COWS), Site-on-Wheels (SOWS), Tower-on-Wheels (TOWS), Mobile Tower Unit (MTU)

Remote Shelter Delivered by Bell 214

Performance proven by time and validated by independent testing. Pepro’s integrated fixed radio sites require no foundation and no excavation, this eliminates the need for geo-technical, environmental impact and/or archeological studies after initial site selection approval.

Pepro radio sites can be installed and removed in less than a day and never leave a footprint.

  • Little to no ground disturbance
  • No excavation
  • No permanent foundation
Pepro Remote Communication Shelter, Walk-In Shelter, Mountain-Top Shelter, delivered by helicopter, Cell-on-Wheels (COWS), Site-on-Wheels (SOWS), Tower-on-Wheels (TOWS), Mobile Tower Unit (MTU)

Mountaintop Shelter at Snow Peak



SPECIFICATIONS /SIZES
6 × 6
6 × 8
8 × 8
8 × 10
8 × 12
WEIGHT (Lbs)
2,400
2,500
2,950
3,200
4,500
FOOTPRINT
10’ x 10’
10’ x 12’
12’ x 12’
12’ x 14’
12’ x 16’
LEVELING JACKS
4
4
4
4
6
CABLE ENTRY OPENINGS
9
9
9
9
9
FLOOR LOAD (lbs/sq. ft)
400
400
400
400
400
ROOF LOAD (lbs/sq. ft)
200
200
200
200
200
7ft RACKS
1
1
2
4
6
GroundingIncluded With Each Shelter
Pepro's Faraday Cage DesignCorner Lifting Lugs
Ufer Ground Cement Pads ProvidedRubber Composite Floor
EGB Pass Thru at Power Entry LocationInstallation Instructions